§ A128-2. Fee schedule established.
Latest version.
-
A.The following fee schedule is hereby adopted.(1)Building permits: $60, plus $3 per thousand of construction over $2,000.[Amended 11-21-2017 by Res. No. 2017-12](2)Zoning permits: $60, plus $3 per thousand of construction over $2,000[Amended 11-21-2017 by Res. No. 2017-12](3)Demolition permits: $75.[Amended 11-21-2017 by Res. No. 2017-12](4)Inspection fees: 15% above inspection agency.(5)Tool / tent sales: $150.[Amended 11-21-2017 by Res. No. 2017-12](6)Business occupancy permit: $50.(7)Land development: $175, plus engineering fees.[Amended 11-21-2017 by Res. No. 2017-12](8)Subdivision: $75 per lot.[Amended 11-21-2017 by Res. No. 2017-12](9)Major subdivision: $300 first lot; $25 for each additional lot; plus engineers' cost.[Amended 11-21-2017 by Res. No. 2017-12](10)Junkyard license, to be allocated for the type of activity conducted within the yard (recycling, scrap or salvage):[Amended 4-16-2013 by Res. No. 2013-03; 11-21-2017 by Res. No. 2017-12](a)One activity: $200.(b)Any two activities: $300.(c)All three activities: $400.(11)Sewer tap: $750.[Amended 11-21-2017 by Res. No. 2017-12](12)Sewer surcharge: $8 per thousand gallons of usage.[Amended 2-5-2013 by Res. No. 2013-02; 12-3-2013 by Res. No. 2013-08; 8-18-2015 by Res. No. 2015-06; 7-19-2016 by Res. No. 2016-07](13)Vacating alleys and streets: $350.(14)Variance from Zoning Hearing Board: $400.[Amended 11-21-2017 by Res. No. 2017-12](15)Conditional use: $400.[Amended 11-21-2017 by Res. No. 2017-12](16)Trailer park permits: $75 per year, plus $20 per trailer.[Amended 11-21-2017 by Res. No. 2017-12](17)Road occupancy permits: $125.[Amended 11-21-2017 by Res. No. 2017-12](18)Driveway permits: $125.[Amended 11-21-2017 by Res. No. 2017-12](19)Timbering permits: $300.[Amended 11-21-2017 by Res. No. 2017-12](20)Mining permits: $500.[Amended 11-21-2017 by Res. No. 2017-12](21)On-lot sewer permits: $600.[Amended 11-3-2009 by Res. No. 2009-13A](22)Inspection of Township roads that are to be bonded:[Added 9-18-2017 by Res. No. 2017-09](a)For each road to be inspected, including the before-bonding and the after-bonding inspection: $95.(b)Intermittent inspections of bonded roads (if required): $49.50 for each additional inspection.B.Any violations of required permits will result in fees being doubled.
Amended 9-17-2002 by Res. No. 2002-10; 5-6-2003 by Res. No.
2003-09; 3-1-2005 by Res. No. 2005-04; 11-15-2005 by Res. No.
2005-10A; 2-6-2007 by Res. No. 2007-03; 10-3-2007 by Res. No. 2007-08; 1-5-2009 by Res. No. 2009-01